{"id":105117,"date":"2017-11-27T18:01:45","date_gmt":"2017-11-27T09:01:45","guid":{"rendered":"http:\/\/www.fukuoka-now.com\/?post_type=news&#038;p=105117&#038;lang=en"},"modified":"2017-11-27T18:01:45","modified_gmt":"2017-11-27T09:01:45","slug":"kyuden-to-make-cost-saving-changes","status":"publish","type":"news","link":"https:\/\/www.fukuoka-now.com\/en\/news\/kyuden-to-make-cost-saving-changes\/","title":{"rendered":"Kyuden to Make Cost Saving Changes"},"content":{"rendered":"<p>Kyushu Electric Power Company,  Inc. (Kyuden) will increase operations on coal-fired thermal power plants\u200b instead of relying on liquefied natural gas (LNG) in a move that could save \u00a53 billion per inspection. Currently, it is necessary to conduct periodic inspections every two years for boilers and every four years for steam turbines at thermal power stations. However, in order to make up for the suspension of nuclear power plants after the Great East Japan Earthquake, the country has taken measures to extend the interval between inspections if certain criteria is met. Increasing the number of sensors and checkpoints at coal-fired power plants, along with the enforcement of independent inspections on weekends or at two-week periods will mean that Kyuden can extend the period between large-scale inspections to six year intervals. <strong>Source:<\/strong> <a href=\"https:\/\/www.nikkei.com\/article\/DGKKZO22005400W7A001C1LX0000\/\" rel=\"noopener\" target=\"_blank\">Nikkei Shimbun<\/a>, 10\/7\/2017<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2017\/11\/kyuden-to-make-changes-1024x646.jpg?resize=1024%2C646\" alt=\"\" width=\"1024\" height=\"646\" class=\"alignnone size-large wp-image-105118\" srcset=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2017\/11\/kyuden-to-make-changes.jpg?resize=1024%2C646&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2017\/11\/kyuden-to-make-changes.jpg?resize=300%2C189&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2017\/11\/kyuden-to-make-changes.jpg?resize=768%2C484&amp;ssl=1 768w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2017\/11\/kyuden-to-make-changes.jpg?w=1200&amp;ssl=1 1200w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><br \/>\nPhoto: <a href=\"https:\/\/www.facebook.com\/kyuden.jp\/posts\/624478254337085\" rel=\"noopener\" target=\"_blank\">\u4e5d\u5dde\u96fb\u529b<\/a><\/p>\n<p><em><strong>Disclaimer<\/strong>: Fukuoka Now posts summaries of Kyushu area related news for the benefit of those who cannot read Japanese. Contents posted here are mostly summaries of publicly posted news stories from Japanese media organizations. Errors might occur during translation. Those errors are ours, and not the news source\u2019s. Photos and images are sourced separately and are for illustrative purposes only. Please use <a href=\"http:\/\/www.fukuoka-now.com\/contact\/\">this form<\/a> to send feedback and questions. <\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kyushu Electric Power Company,  Inc. (Kyuden) will increase operations on coal-fired thermal power plants\u200b instead of relying on liquefied natural gas (LNG) in a move that could save&#8230;<\/p>\n","protected":false},"author":27918,"featured_media":105118,"comment_status":"open","ping_status":"closed","template":"","tags":[],"class_list":["post-105117","news","type-news","status-publish","has-post-thumbnail","hentry","location-fukuoka-prefecture","news-category-general","en-US"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news\/105117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/users\/27918"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/comments?post=105117"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media\/105118"}],"wp:attachment":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media?parent=105117"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/tags?post=105117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}