{"id":147548,"date":"2022-07-14T15:10:59","date_gmt":"2022-07-14T06:10:59","guid":{"rendered":"https:\/\/www.fukuoka-now.com\/?post_type=news&#038;p=147548&#038;lang=en"},"modified":"2022-07-15T16:12:17","modified_gmt":"2022-07-15T07:12:17","slug":"genkai-nuclear-power-plant-4-to-close-for-anti-terrorism-upgrade","status":"publish","type":"news","link":"https:\/\/www.fukuoka-now.com\/en\/news\/genkai-nuclear-power-plant-4-to-close-for-anti-terrorism-upgrade\/","title":{"rendered":"Genkai Nuclear Plant Gets Anti-terrorism Upgrade"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Kyushu Electric Power resumed power generation at the No. 4 reactor at the Genkai Nuclear Power Plant in Saga Prefecture back on <\/span><span style=\"font-weight: 400;\">July <\/span><span style=\"font-weight: 400;\">13. However, the installation of anti-terrorism facilities required by the Nuclear Regulatory Commission is expected to take until around February of next year, and so the plant will be shut down again on September 12, the day before the deadline for installation. Kyushu Electric Power Co. calls for as much power saving as possible, saying that even if power generation at the Genkai Unit 4 reactor resumes, the summer power shortage situation will continue. <\/span><b>Source:<\/b> <a href=\"https:\/\/rkb.jp\/news-rkb\/202207132345\/\" rel=\"noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">RKB<\/span><\/a><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-147551\" src=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2022\/07\/fnn_genkai-nuclear-power-plant_2022_cl.jpg?resize=1400%2C788&#038;ssl=1\" alt=\"Genkai Nuclear Power Plant 4 To Close For Anti-terrorism Upgrade \" width=\"1400\" height=\"788\" srcset=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2022\/07\/fnn_genkai-nuclear-power-plant_2022_cl.jpg?w=1400&amp;ssl=1 1400w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2022\/07\/fnn_genkai-nuclear-power-plant_2022_cl.jpg?resize=300%2C169&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2022\/07\/fnn_genkai-nuclear-power-plant_2022_cl.jpg?resize=1024%2C576&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2022\/07\/fnn_genkai-nuclear-power-plant_2022_cl.jpg?resize=768%2C432&amp;ssl=1 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p><b>Get Fukuoka &amp; Kyushu area news and events in English regularly.<\/b><span style=\"font-weight: 400;\"> Sign up for our <\/span><b>free<\/b><span style=\"font-weight: 400;\"> weekly newsletter. Opt out at any time and privacy is protected. <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/mailmagazine\/\"><span style=\"font-weight: 400;\">Get the \u201cNow\u201d<\/span><\/a><\/p>\n<p><span style=\"font-weight: 400;\">Disclaimer: These summaries are from publicly posted contents. Errors might occur during translation. Images are sourced independently for illustrative purposes and credited appropriately. Use <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/contact\/\"><span style=\"font-weight: 400;\">this form<\/span><\/a><span style=\"font-weight: 400;\"> to send feedback or ask for edits.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kyushu Electric Power resumed power generation at the No. 4 reactor at the Genkai Nuclear Power Plant in Saga Prefecture back on July 13. However, the installation of anti-terrorism facilities required by&#8230;<\/p>\n","protected":false},"author":29305,"featured_media":147552,"comment_status":"open","ping_status":"closed","template":"","tags":[],"class_list":["post-147548","news","type-news","status-publish","has-post-thumbnail","hentry","location-saga-prefecture","news-category-general","en-US"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news\/147548","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/users\/29305"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/comments?post=147548"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media\/147552"}],"wp:attachment":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media?parent=147548"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/tags?post=147548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}