{"id":151362,"date":"2023-02-03T12:07:31","date_gmt":"2023-02-03T03:07:31","guid":{"rendered":"https:\/\/www.fukuoka-now.com\/?post_type=news&#038;p=151362&#038;lang=en"},"modified":"2023-02-03T12:17:08","modified_gmt":"2023-02-03T03:17:08","slug":"kyushu-electric-to-consider-early-restart-for-genkai-unit-4","status":"publish","type":"news","link":"https:\/\/www.fukuoka-now.com\/en\/news\/kyushu-electric-to-consider-early-restart-for-genkai-unit-4\/","title":{"rendered":"Kyushu Electric to Consider Early Restart for Genkai Unit 4"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The facility is equipped to inject water if the reactor loses its cooling function in the event of an aircraft collision. Genkai Unit 3 was completed on December 5, <\/span><span style=\"font-weight: 400;\">2022<\/span><span style=\"font-weight: 400;\">., and resumed power generation on December 12, <\/span><span style=\"font-weight: 400;\">2022<\/span><span style=\"font-weight: 400;\">. Unit 4 has been shut down since <\/span><span style=\"font-weight: 400;\">September 12, 2022<\/span><span style=\"font-weight: 400;\"> due to missed deadline and will undergo examination with a possibility of restarting on February 16. The facility can inject water in case of cooling failure from an aircraft collision. Genkai Unit 3 has already been completed and resumed power generation. <\/span><b>Source: <\/b><a href=\"https:\/\/www.nikkei.com\/article\/DGXZQOJC0293D0S3A200C2000000\/\" rel=\"noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">Nikkei<\/span><\/a><span style=\"font-weight: 400;\"> \/ <\/span><a href=\"https:\/\/www3.nhk.or.jp\/lnews\/saga\/20230105\/5080013562.html\" rel=\"noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">NHK<\/span><\/a><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-151350\" src=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/02\/fnn_genkai-four_2023_cl.jpg?resize=1400%2C793&#038;ssl=1\" alt=\"Kyushu Electric to consider early restart for Genkai Unit 4\" width=\"1400\" height=\"793\" srcset=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/02\/fnn_genkai-four_2023_cl.jpg?w=1400&amp;ssl=1 1400w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/02\/fnn_genkai-four_2023_cl.jpg?resize=300%2C170&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/02\/fnn_genkai-four_2023_cl.jpg?resize=1024%2C580&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/02\/fnn_genkai-four_2023_cl.jpg?resize=768%2C435&amp;ssl=1 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p><b>Get Fukuoka &amp; Kyushu area news and events in English regularly.<\/b><span style=\"font-weight: 400;\"> Sign up for our <\/span><b>free<\/b><span style=\"font-weight: 400;\"> weekly newsletter. Opt out at any time and privacy is protected. <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/mailmagazine\/\"><span style=\"font-weight: 400;\">Get the \u201cNow\u201d<\/span><\/a><\/p>\n<p><span style=\"font-weight: 400;\">Disclaimer: These summaries are from publicly posted contents. Errors might occur during translation. Images are sourced independently for illustrative purposes and credited appropriately. Use <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/contact\/\"><span style=\"font-weight: 400;\">this form<\/span><\/a><span style=\"font-weight: 400;\"> to send feedback or ask for edits.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The facility is equipped to inject water if the reactor loses its cooling function in the event of an aircraft collision. Genkai Unit 3 was completed on December 5, 2022., and resumed power generation on December 12, 2022&#8230;<\/p>\n","protected":false},"author":29305,"featured_media":151356,"comment_status":"closed","ping_status":"closed","template":"","tags":[],"class_list":["post-151362","news","type-news","status-publish","has-post-thumbnail","hentry","location-saga-prefecture","news-category-general","en-US"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news\/151362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/users\/29305"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/comments?post=151362"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media\/151356"}],"wp:attachment":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media?parent=151362"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/tags?post=151362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}