{"id":151926,"date":"2023-03-09T17:59:40","date_gmt":"2023-03-09T08:59:40","guid":{"rendered":"https:\/\/www.fukuoka-now.com\/?post_type=news&#038;p=151926&#038;lang=en"},"modified":"2023-03-09T17:59:40","modified_gmt":"2023-03-09T08:59:40","slug":"kyushu-electric-resumes-normal-operation-of-genkai-nuclear-plant","status":"publish","type":"news","link":"https:\/\/www.fukuoka-now.com\/en\/news\/kyushu-electric-resumes-normal-operation-of-genkai-nuclear-plant\/","title":{"rendered":"Kyushu Electric Resumes Normal Operation of Genkai Nuclear Plant"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Kyushu Electric Power has resumed normal operation of the No. 4 unit at its Genkai Nuclear Power Plant following regular inspections. The unit had been undergoing inspections since September <\/span><span style=\"font-weight: 400;\">2022<\/span><span style=\"font-weight: 400;\">, and its gradual return to operation began on February 9, <\/span><span style=\"font-weight: 400;\">2023<\/span><span style=\"font-weight: 400;\">. With the resumption of the No. 4 unit, Kyushu Electric Power now has three of its four nuclear power plants in operation. The company stated that it would continue to prioritize safe and stable operation in the future. <\/span><b>Source:<\/b> <a href=\"https:\/\/kbc.co.jp\/news\/article.php?id=9789946&amp;ymd=2023-03-08\" rel=\"noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">KBC<\/span><\/a><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/03\/fnn_genkai-nuclear-plant-4-kbc_2023_cl.jpg?resize=1400%2C779&#038;ssl=1\" alt=\"Kyushu Electric Resumes Normal Operation of Genkai Nuclear Plant\" width=\"1400\" height=\"779\" class=\"alignnone size-full wp-image-151932\" srcset=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/03\/fnn_genkai-nuclear-plant-4-kbc_2023_cl.jpg?w=1400&amp;ssl=1 1400w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/03\/fnn_genkai-nuclear-plant-4-kbc_2023_cl.jpg?resize=300%2C167&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/03\/fnn_genkai-nuclear-plant-4-kbc_2023_cl.jpg?resize=1024%2C570&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/03\/fnn_genkai-nuclear-plant-4-kbc_2023_cl.jpg?resize=768%2C427&amp;ssl=1 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p><b>Get Fukuoka &amp; Kyushu area news and events in English regularly.<\/b><span style=\"font-weight: 400;\"> Sign up for our <\/span><b>free<\/b><span style=\"font-weight: 400;\"> weekly newsletter. Opt out at any time and privacy is protected. <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/mailmagazine\/\"><span style=\"font-weight: 400;\">Get the \u201cNow\u201d<\/span><\/a><\/p>\n<p><span style=\"font-weight: 400;\">Disclaimer: These summaries are from publicly posted contents. Errors might occur during translation. Images are sourced independently for illustrative purposes and credited appropriately. Use <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/contact\/\"><span style=\"font-weight: 400;\">this form<\/span><\/a><span style=\"font-weight: 400;\"> to send feedback or ask for edits.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kyushu Electric Power has resumed normal operation of the No. 4 unit at its Genkai Nuclear Power Plant following regular inspections. The unit had been undergoing inspections since September 2022, and&#8230;<\/p>\n","protected":false},"author":29305,"featured_media":151934,"comment_status":"closed","ping_status":"closed","template":"","tags":[],"class_list":["post-151926","news","type-news","status-publish","has-post-thumbnail","hentry","location-saga-prefecture","news-category-general","en-US"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news\/151926","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/users\/29305"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/comments?post=151926"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media\/151934"}],"wp:attachment":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media?parent=151926"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/tags?post=151926"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}