{"id":157289,"date":"2023-10-10T10:39:44","date_gmt":"2023-10-10T01:39:44","guid":{"rendered":"https:\/\/www.fukuoka-now.com\/?post_type=news&#038;p=157289&#038;lang=en"},"modified":"2023-10-10T10:39:44","modified_gmt":"2023-10-10T01:39:44","slug":"yaskawa-electric-to-build-new-factory-for-robot-production","status":"publish","type":"news","link":"https:\/\/www.fukuoka-now.com\/en\/news\/yaskawa-electric-to-build-new-factory-for-robot-production\/","title":{"rendered":"Yaskawa Electric to Build New Factory for Robot Production"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Yaskawa Electric is planning to construct a new factory within its Yahatanishi Plant premises in Kitakyushu City, focusing on the end-to-end production of industrial robots, starting from the motor components. The new two-story factory will have a total floor area of around 28,000 square meters. Construction is set to begin in the 2024 fiscal year, aiming for operation in 2025. The total investment is estimated to be around 20 billion yen. The new facility is expected to increase the group&#8217;s monthly robot production capacity by 1.5 times from the current 5,400 units, responding to the growing demand for robots due to the expansion of the semiconductor and electric vehicle (EV) markets. <\/span><b>Source: <\/b><a href=\"http:\/\/www.fiba.jp\/\" rel=\"noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">FIBA<\/span><\/a><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-157290\" src=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/10\/fnn_yaskawa-head-office_2023_cl.jpg?resize=1400%2C1050&#038;ssl=1\" alt=\"Yaskawa Electric to Build New Factory for Robot Production\" width=\"1400\" height=\"1050\" srcset=\"https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/10\/fnn_yaskawa-head-office_2023_cl.jpg?w=1400&amp;ssl=1 1400w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/10\/fnn_yaskawa-head-office_2023_cl.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/10\/fnn_yaskawa-head-office_2023_cl.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/www.fukuoka-now.com\/wp-content\/uploads\/2023\/10\/fnn_yaskawa-head-office_2023_cl.jpg?resize=768%2C576&amp;ssl=1 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">Stay informed with the latest Fukuoka &amp; Kyushu news and events in English. Sign up for our <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/mailmagazine\/\"><span style=\"font-weight: 400;\">free weekly newsletter <\/span><\/a><span style=\"font-weight: 400;\">today and never miss a beat. Opt out anytime, your privacy is our priority. Get the inside scoop with <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/mailmagazine\/\"><span style=\"font-weight: 400;\">The Now<\/span><\/a><\/p>\n<p><span style=\"font-weight: 400;\">Summaries based on public content, errors may occur during translation. Images credited independently. Send feedback using <\/span><a href=\"https:\/\/www.fukuoka-now.com\/en\/contact\/\"><span style=\"font-weight: 400;\">this <\/span><b>form<\/b><span style=\"font-weight: 400;\">.<\/span><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yaskawa Electric is planning to construct a new factory within its Yahatanishi Plant premises in Kitakyushu City, focusing on the end-to-end production of industrial robots, starting&#8230;<\/p>\n","protected":false},"author":29305,"featured_media":157294,"comment_status":"closed","ping_status":"closed","template":"","tags":[],"class_list":["post-157289","news","type-news","status-publish","has-post-thumbnail","hentry","location-kitakyushu","news-category-business","en-US"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news\/157289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/users\/29305"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/comments?post=157289"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media\/157294"}],"wp:attachment":[{"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/media?parent=157289"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fukuoka-now.com\/wp-json\/wp\/v2\/tags?post=157289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}