Local News

Genkai Nuclear Power Plant Unit 3 to Resume Operations

Kyushu Electric Power Co. announced on December 7 that Genkai Nuclear Power Plant Unit 3 (Genkai-machi, Saga Prefecture), which has been shut down since late January due to delays in the construction of anti-terrorism facilities, will resume operations on December 12. The plant was previously scheduled to resume power generation on December 17 but will start up its reactors on December 10 and return to normal operation in early January 2023 after an adjustment operation to check the operation of the equipment. Source: Kyushu Electric Power / Nikkei / NHK

Genkai Nuclear Power Plant Unit 3 to Resume Operations

Get Fukuoka & Kyushu area news and events in English regularly. Sign up for our free weekly newsletter. Opt out at any time and privacy is protected. Get the “Now”

Disclaimer: These summaries are from publicly posted contents. Errors might occur during translation. Images are sourced independently for illustrative purposes and credited appropriately. Use this form to send feedback or ask for edits.

Category
General
Saga Prefecture
Published: Dec 9, 2022 / Last Updated: Dec 9, 2022

Comments are closed.

ページトップに戻る