Local News

Kyushu Electric Resumes Normal Operation of Genkai Nuclear Plant

Kyushu Electric Power has resumed normal operation of the No. 4 unit at its Genkai Nuclear Power Plant following regular inspections. The unit had been undergoing inspections since September 2022, and its gradual return to operation began on February 9, 2023. With the resumption of the No. 4 unit, Kyushu Electric Power now has three of its four nuclear power plants in operation. The company stated that it would continue to prioritize safe and stable operation in the future. Source: KBC

Kyushu Electric Resumes Normal Operation of Genkai Nuclear Plant

Get Fukuoka & Kyushu area news and events in English regularly. Sign up for our free weekly newsletter. Opt out at any time and privacy is protected. Get the “Now”

Disclaimer: These summaries are from publicly posted contents. Errors might occur during translation. Images are sourced independently for illustrative purposes and credited appropriately. Use this form to send feedback or ask for edits.

Category
General
Saga Prefecture
Published: Mar 9, 2023 / Last Updated: Mar 9, 2023

Comments are closed.

ページトップに戻る