Local News

Kyushu Electric Power Updates Tsunami Assumptions for Genkai Nuclear Plant

Kyushu Electric Power announced an update to its tsunami assumptions for the Genkai Nuclear Power Plant, raising the estimated post-seismic sea level rise from 0.7 meters to 1.3 meters. Despite this revision, no additional construction is required as the plant remains secure. The update follows the government’s latest long-term evaluation of sea faults. Source: NHK

Kyushu Electric Power Updates Tsunami Assumptions for Genkai Nuclear Plant

Stay informed with the latest Fukuoka & Kyushu news and events in English. Sign up for our free weekly newsletter today and never miss a beat. Opt out anytime, your privacy is our priority. Get the inside scoop with The Now

Summaries based on public content, errors may occur during translation. Images credited independently. Send feedback using this form.

Published

Last Updated