JR Kyushu is considering running the new N700S train along a part of the Nagasaki shinkansen line set to open in 2022. If implemented, the N700 model would operate between Nagasaki and Takeo-Onsen Station, which will serve as a connecting point between standard express trains and the shinkansen line. Plans are currently in place for the N700S, which has been developed by JR Tokai, to go into commercial use on the Tokaido shinkansen line in 2020. The N700S is seen as an easily adjustable, flexible option because its carriages do not have to come in pairs, as is usually the case with shinkansen trains. Performance checks will take place on the new vehicle once it has been manufactured before deciding whether or not to start mass-production. Source: Saga Shimbun, 7/1/2017

Photo for image purpose only. Source.
Disclaimer: Fukuoka Now posts summaries of Kyushu area related news for the benefit of those who cannot read Japanese. Contents posted here are mostly summaries of publicly posted news stories from Japanese media organizations. Errors might occur during translation. Those errors are ours, and not the news source’s. Photos and images are sourced separately and are for illustrative purposes only. Please use this form to send feedback and questions.